ETS PRE-TOOLING RISK CHECKLIST Source: /tools/checklist on ETS-corp.com Use this before releasing CAD for tooling. 1) PART BASICS - Part name - Company - Drawing number - Part function 2) OPERATING CONDITIONS (NORMAL / MAX / MIN) - Operating temperature - Service life - Loads - Load time on - Load time off - Other conditions (chemical, moisture, impact, stall, etc.) 3) ENVIRONMENT - Chemical exposure - Moisture exposure - Temperature exposure - Sunlight direct - Sunlight indirect 4) DESIGN REQUIREMENTS - Safety factor - Tolerances - Decorating requirements - Assembly constraints - Sag requirements - Finish requirements - Other requirements 5) PERFORMANCE SPECIFICATIONS - Required performance behavior - Failure limits - Acceptance thresholds 6) OTHER NOTES - Manufacturing constraints - Validation concerns - Program-specific risks Next step: - Run full checklist at /tools/checklist - Request expert review at /services/design-review